US Bridges

US24 HWY over Plum Creek Drainage

Fair

Mitchell County, Kansas · 3.37 MI SE K-9 · Structure no. 999902400620161

Built
1952
73 years old
Condition
Fair
inspected November 2024
Type
Culvert
Concrete
Length
29 ft
2 main spans
Daily traffic
2,238
2023 count
Owner
State
State Highway Agency

About this bridge

US24 HWY over Plum Creek Drainage is a concrete culvert carrying US24 HWY over Plum Creek Drainage in Mitchell County, Kansas. It was built in 1952, so it is 73 years old, older than the Kansas average of 52.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 2,238 vehicles a day, roughly 24% of them trucks, projected to reach 2,573 by 2044. The structure is 29 ft (8.8 m) long and 43 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesUS24 HWY
CrossesPlum Creek Drainage
Location3.37 MI SE K-9
RouteU.S. Route 24
StateKansas
Coordinates39.44306, -98.06917
Functional classRural Principal Arterial - Other

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Channel and channel protection7 GoodSome minor problems.
Culvert6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionNovember 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Waterway adequacy6: Equal to present minimum criteria
Approach roadway alignment7: Better than present minimum criteria
Operating rating81.4 US tons
Inventory rating49.1 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckConcrete, cast-in-place
Main spans2
Design loadH 20
Structure length29 ft (8.8 m)
Longest span14 ft (4.3 m)
Deck width43 ft (13 m)
Roadway width28 ft (8.5 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic2,238 (2023)
Projected traffic2,573 by 2044
Trucks24%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was US24 HWY over Plum Creek Drainage built?

It was built in 1952, making it 73 years old in 2025.

What condition is US24 HWY over Plum Creek Drainage in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in November 2024.

How much traffic does US24 HWY over Plum Creek Drainage carry?

About 2,238 vehicles per day (2023 count), of which roughly 24% are trucks.

How long is US24 HWY over Plum Creek Drainage?

The structure is 29 ft (8.8 m) long with a longest span of 14 ft (4.3 m) and a deck 43 ft wide.

Who owns US24 HWY over Plum Creek Drainage?

It is owned by the State Highway Agency.