US Bridges

Local Rd. GU3 over Trib. to Solomon River

Fair

Mitchell County, Kansas · 1.2N 0.7E of Beloit · Structure no. 000620739003723

Built
1963
62 years old, rebuilt 1982
Condition
Fair
inspected March 2023
Type
Stringer/Multi-beam or Girder
Steel
Length
25 ft
1 main span
Daily traffic
80
2002 count
Owner
County
County Highway Agency

About this bridge

Local Rd. GU3 over Trib. to Solomon River is a steel stringer/multi-beam or girder carrying Local Rd. GU3 over Trib. to Solomon River in Mitchell County, Kansas. It was built in 1963 and reconstructed in 1982, so it is 62 years old, older than the Kansas average of 52.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 80 vehicles a day, projected to reach 100 by 2043. The structure is 25 ft (7.6 m) long and 24 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesLocal Rd. GU3
CrossesTrib. to Solomon River
Location1.2N 0.7E of Beloit
RouteCounty Highway 0
StateKansas
Coordinates39.47583, -98.0975
Functional classRural Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Channel and channel protection5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Last inspectionMarch 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; action required to protect exposed foundations
Structural evaluation6: Equal to present minimum criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating46.6 US tons
Inventory rating29.8 US tons

Structure

MaterialSteel
DeckConcrete, cast-in-place
Main spans1
Design loadH 20
Structure length25 ft (7.6 m)
Longest span23 ft (7 m)
Deck width24 ft (7.3 m)
Roadway width24 ft (7.3 m)
Vertical clearance over deck100 ft (30.5 m)

Traffic and service

Average daily traffic80 (2002)
Projected traffic100 by 2043
Trucks0%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Local Rd. GU3 over Trib. to Solomon River built?

It was built in 1963, making it 62 years old in 2025. It was reconstructed in 1982.

What condition is Local Rd. GU3 over Trib. to Solomon River in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in March 2023.

How much traffic does Local Rd. GU3 over Trib. to Solomon River carry?

About 80 vehicles per day (2002 count).

How long is Local Rd. GU3 over Trib. to Solomon River?

The structure is 25 ft (7.6 m) long with a longest span of 23 ft (7 m) and a deck 24 ft wide.

Who owns Local Rd. GU3 over Trib. to Solomon River?

It is owned by the County Highway Agency.