US Bridges

Merdian Rd. over North Cottonwood River

Good

Marion County, Kansas · 1.3S 7.6W of Durham · Structure no. 000570817005121

Built
1975
50 years old
Condition
Good
inspected December 2024
Type
Stringer/Multi-beam or Girder
Steel Continuous
Length
88 ft
3 main spans
Daily traffic
25
2020 count
Owner
County
County Highway Agency

About this bridge

Merdian Rd. over North Cottonwood River is a steel continuous stringer/multi-beam or girder carrying Merdian Rd. over North Cottonwood River in Marion County, Kansas. It was built in 1975, so it is 50 years old, younger than the Kansas average of 52.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 25 vehicles a day, roughly 5% of them trucks, projected to reach 30 by 2044. The structure is 88 ft (26.7 m) long and 26 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesMerdian Rd.
CrossesNorth Cottonwood River
Location1.3S 7.6W of Durham
RouteCounty Highway 0
StateKansas
Coordinates38.46258, -97.37189
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionDecember 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; action required to protect exposed foundations
Structural evaluation6: Equal to present minimum criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating43.9 US tons
Inventory rating26.3 US tons

Structure

MaterialSteel Continuous
DeckConcrete, cast-in-place
Main spans3
Design loadUnknown
Structure length88 ft (26.7 m)
Longest span34 ft (10.3 m)
Deck width26 ft (7.9 m)
Roadway width24 ft (7.3 m)
Vertical clearance over deck100 ft (30.5 m)

Traffic and service

Average daily traffic25 (2020)
Projected traffic30 by 2044
Trucks5%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Merdian Rd. over North Cottonwood River built?

It was built in 1975, making it 50 years old in 2025.

What condition is Merdian Rd. over North Cottonwood River in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in December 2024.

How much traffic does Merdian Rd. over North Cottonwood River carry?

About 25 vehicles per day (2020 count), of which roughly 5% are trucks.

How long is Merdian Rd. over North Cottonwood River?

The structure is 88 ft (26.7 m) long with a longest span of 34 ft (10.3 m) and a deck 26 ft wide.

Who owns Merdian Rd. over North Cottonwood River?

It is owned by the County Highway Agency.