I-335 HWY (kta) NB over Aban. RR Bike Trail
GoodLyon County, Kansas · 4.90 MI NE N JCT K-99 · Structure no. 999933500561033
- Built
- 1956
- 69 years old, rebuilt 1987
- Condition
- Good
- inspected July 2024
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 157 ft
- 3 main spans
- Daily traffic
- 5,825
- 2023 count
- Owner
- Toll Authority
- State Toll Authority
About this bridge
I-335 HWY (kta) NB over Aban. RR Bike Trail is a steel continuous stringer/multi-beam or girder carrying I-335 HWY (kta) NB over Aban. RR Bike Trail in Lyon County, Kansas. It was built in 1956 and reconstructed in 1987, so it is 69 years old, older than the Kansas average of 52.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 5,825 vehicles a day, roughly 27% of them trucks, projected to reach 8,322 by 2044. The structure is 157 ft (47.9 m) long and 34 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was I-335 HWY (kta) NB over Aban. RR Bike Trail built?
It was built in 1956, making it 69 years old in 2025. It was reconstructed in 1987.
What condition is I-335 HWY (kta) NB over Aban. RR Bike Trail in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in July 2024.
How much traffic does I-335 HWY (kta) NB over Aban. RR Bike Trail carry?
About 5,825 vehicles per day (2023 count), of which roughly 27% are trucks.
How long is I-335 HWY (kta) NB over Aban. RR Bike Trail?
The structure is 157 ft (47.9 m) long with a longest span of 59 ft (18 m) and a deck 34 ft wide.
Who owns I-335 HWY (kta) NB over Aban. RR Bike Trail?
It is owned by the State Toll Authority.