US Bridges

Tiger Road over US-69 HWY

Good

Linn County, Kansas · 1.77 MI N So JCT K52 · Structure no. 999906900540691

Built
2007
18 years old
Condition
Good
inspected February 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete Continuous
Length
342 ft
4 main spans
Daily traffic
523
2023 count
Owner
State
State Highway Agency

About this bridge

Tiger Road over US-69 HWY is a prestressed concrete continuous stringer/multi-beam or girder carrying Tiger Road over US-69 HWY in Linn County, Kansas. It was built in 2007, so it is 18 years old, younger than the Kansas average of 52.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 523 vehicles a day, roughly 2% of them trucks. The structure is 342 ft (104.2 m) long and 38 ft wide.

CarriesTiger Road
CrossesUS-69 HWY
Location1.77 MI N So JCT K52
RouteCounty Highway 407
StateKansas
Coordinates38.16778, -94.69583
Functional classRural Major Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure7 GoodSome minor problems.
Last inspectionFebruary 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry7: Better than present minimum criteria
Approach roadway alignment5: Somewhat better than minimum adequacy to tolerate being left in place as is
Operating rating67.5 US tons
Inventory rating40.3 US tons

Structure

MaterialPrestressed Concrete Continuous
DeckNot applicable
Main spans4
Design loadHL 93
Structure length342 ft (104.2 m)
Longest span90 ft (27.5 m)
Deck width38 ft (11.6 m)
Roadway width36 ft (11 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic523 (2023)
Projected traffic—
Trucks2%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesHighway
Detour if closed—
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Tiger Road over US-69 HWY built?

It was built in 2007, making it 18 years old in 2025.

What condition is Tiger Road over US-69 HWY in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in February 2024.

How much traffic does Tiger Road over US-69 HWY carry?

About 523 vehicles per day (2023 count), of which roughly 2% are trucks.

How long is Tiger Road over US-69 HWY?

The structure is 342 ft (104.2 m) long with a longest span of 90 ft (27.5 m) and a deck 38 ft wide.

Who owns Tiger Road over US-69 HWY?

It is owned by the State Highway Agency.