US Bridges

HP-19 Mcintyre RD over Stranger Creek

Good

Leavenworth County, Kansas · 1.0N 0.5E of Jarbalo · Structure no. 000000000520115

Built
2022
3 years old
Condition
Good
inspected July 2024
Type
Girder and Floorbeam System
Prestressed Concrete
Length
302 ft
3 main spans
Daily traffic
405
2019 count
Owner
County
County Highway Agency

About this bridge

HP-19 Mcintyre RD over Stranger Creek is a prestressed concrete girder and floorbeam system carrying HP-19 Mcintyre RD over Stranger Creek in Leavenworth County, Kansas. It was built in 2022, so it is 3 years old, younger than the Kansas average of 52.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 405 vehicles a day, roughly 10% of them trucks, projected to reach 450 by 2042. The structure is 302 ft (92.2 m) long and 34 ft wide. If it were closed, the detour would be 6.2 mi (10 km).

CarriesHP-19 Mcintyre RD
CrossesStranger Creek
Location1.0N 0.5E of Jarbalo
RouteCounty Highway 383
StateKansas
Coordinates39.21572, -95.05967
Functional classRural Major Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Channel and channel protection7 GoodSome minor problems.
Last inspectionJuly 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation8: Equal to present desirable criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating55.3 US tons
Inventory rating42.5 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans3
Design loadHL 93
Structure length302 ft (92.2 m)
Longest span120 ft (36.5 m)
Deck width34 ft (10.4 m)
Roadway width32 ft (9.8 m)
Vertical clearance over deck100 ft (30.5 m)

Traffic and service

Average daily traffic405 (2019)
Projected traffic450 by 2042
Trucks10%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed6.2 mi (10 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was HP-19 Mcintyre RD over Stranger Creek built?

It was built in 2022, making it 3 years old in 2025.

What condition is HP-19 Mcintyre RD over Stranger Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in July 2024.

How much traffic does HP-19 Mcintyre RD over Stranger Creek carry?

About 405 vehicles per day (2019 count), of which roughly 10% are trucks.

How long is HP-19 Mcintyre RD over Stranger Creek?

The structure is 302 ft (92.2 m) long with a longest span of 120 ft (36.5 m) and a deck 34 ft wide.

Who owns HP-19 Mcintyre RD over Stranger Creek?

It is owned by the County Highway Agency.