US59 HWY over Labette Creek Drainage
FairLabette County, Kansas · 5.44 MI N Wjct US-160 · Structure no. 999905900500101
- Built
- 1959
- 66 years old
- Condition
- Fair
- inspected March 2024
- Type
- Slab
- Concrete Continuous
- Length
- 107 ft
- 3 main spans
- Daily traffic
- 3,016
- 2023 count
- Owner
- State
- State Highway Agency
About this bridge
US59 HWY over Labette Creek Drainage is a concrete continuous slab carrying US59 HWY over Labette Creek Drainage in Labette County, Kansas. It was built in 1959, so it is 66 years old, older than the Kansas average of 52.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 3,016 vehicles a day, roughly 9% of them trucks, projected to reach 3,399 by 2044. The structure is 107 ft (32.5 m) long and 46 ft wide. If it were closed, the detour would be 3.1 mi (5 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was US59 HWY over Labette Creek Drainage built?
It was built in 1959, making it 66 years old in 2025.
What condition is US59 HWY over Labette Creek Drainage in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in March 2024.
How much traffic does US59 HWY over Labette Creek Drainage carry?
About 3,016 vehicles per day (2023 count), of which roughly 9% are trucks.
How long is US59 HWY over Labette Creek Drainage?
The structure is 107 ft (32.5 m) long with a longest span of 40 ft (12.2 m) and a deck 46 ft wide.
Who owns US59 HWY over Labette Creek Drainage?
It is owned by the State Highway Agency.