Rs 32 -Sun City RD over Soldiers Creek
GoodPosted for loadKiowa County, Kansas · 2.5S.E. of Belvidere · Structure no. 000000000490040
- Built
- 1980
- 45 years old
- Condition
- Good
- inspected December 2024
- Type
- Slab
- Concrete Continuous
- Length
- 113 ft
- 3 main spans
- Daily traffic
- 45
- 2021 count
- Owner
- County
- County Highway Agency
About this bridge
Rs 32 -Sun City RD over Soldiers Creek is a concrete continuous slab carrying Rs 32 -Sun City RD over Soldiers Creek in Kiowa County, Kansas. It was built in 1980, so it is 45 years old, younger than the Kansas average of 52.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. Its operating status is: posted for load restriction.
It carries about 45 vehicles a day, roughly 10% of them trucks, projected to reach 55 by 2046. The structure is 113 ft (34.3 m) long and 30 ft wide. If it were closed, the detour would be 16.8 mi (27 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Rs 32 -Sun City RD over Soldiers Creek built?
It was built in 1980, making it 45 years old in 2025.
What condition is Rs 32 -Sun City RD over Soldiers Creek in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in December 2024.
How much traffic does Rs 32 -Sun City RD over Soldiers Creek carry?
About 45 vehicles per day (2021 count), of which roughly 10% are trucks.
How long is Rs 32 -Sun City RD over Soldiers Creek?
The structure is 113 ft (34.3 m) long with a longest span of 44 ft (13.4 m) and a deck 30 ft wide.
Who owns Rs 32 -Sun City RD over Soldiers Creek?
It is owned by the County Highway Agency.