US Bridges

K-42 HWY over Chikaskia River Drg

Good

Kingman County, Kansas · 7.62 MI W K14 · Structure no. 999904200481171

Built
2023
2 years old
Condition
Good
inspected August 2023
Type
Slab
Concrete
Length
180 ft
3 main spans
Daily traffic
416
2023 count
Owner
State
State Highway Agency

About this bridge

K-42 HWY over Chikaskia River Drg is a concrete slab carrying K-42 HWY over Chikaskia River Drg in Kingman County, Kansas. It was built in 2023, so it is 2 years old, younger than the Kansas average of 52.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 416 vehicles a day, roughly 16% of them trucks, projected to reach 416 by 2044. The structure is 180 ft (54.9 m) long and 34 ft wide. If it were closed, the detour would be 5 mi (8 km).

CarriesK-42 HWY
CrossesChikaskia River Drg
Location7.62 MI W K14
RouteState Highway 42
StateKansas
Coordinates37.44667, -98.20639
Functional classRural Major Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Channel and channel protection7 GoodSome minor problems.
Last inspectionAugust 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation8: Equal to present desirable criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment7: Better than present minimum criteria
Operating rating68.9 US tons
Inventory rating53.2 US tons

Structure

Structure typeSlab
MaterialConcrete
DeckConcrete, cast-in-place
Main spans3
Design loadHL 93
Structure length180 ft (54.9 m)
Longest span72 ft (21.9 m)
Deck width34 ft (10.4 m)
Roadway width32 ft (9.8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic416 (2023)
Projected traffic416 by 2044
Trucks16%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed5 mi (8 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was K-42 HWY over Chikaskia River Drg built?

It was built in 2023, making it 2 years old in 2025.

What condition is K-42 HWY over Chikaskia River Drg in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in August 2023.

How much traffic does K-42 HWY over Chikaskia River Drg carry?

About 416 vehicles per day (2023 count), of which roughly 16% are trucks.

How long is K-42 HWY over Chikaskia River Drg?

The structure is 180 ft (54.9 m) long with a longest span of 72 ft (21.9 m) and a deck 34 ft wide.

Who owns K-42 HWY over Chikaskia River Drg?

It is owned by the State Highway Agency.