Rs 989 SE 160 Ave over S. Fork Ninnescah River
FairKingman County, Kansas · 8.0N 1.3E of Norwich · Structure no. 000000000480610
- Built
- 1960
- 65 years old
- Condition
- Fair
- inspected January 2023
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 678 ft
- 10 main spans
- Daily traffic
- 285
- 2021 count
- Owner
- County
- County Highway Agency
About this bridge
Rs 989 SE 160 Ave over S. Fork Ninnescah River is a steel continuous stringer/multi-beam or girder carrying Rs 989 SE 160 Ave over S. Fork Ninnescah River in Kingman County, Kansas. It was built in 1960, so it is 65 years old, older than the Kansas average of 52.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 285 vehicles a day, roughly 10% of them trucks, projected to reach 375 by 2043. The structure is 678 ft (206.8 m) long and 26 ft wide. If it were closed, the detour would be 3.7 mi (6 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Rs 989 SE 160 Ave over S. Fork Ninnescah River built?
It was built in 1960, making it 65 years old in 2025.
What condition is Rs 989 SE 160 Ave over S. Fork Ninnescah River in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in January 2023.
How much traffic does Rs 989 SE 160 Ave over S. Fork Ninnescah River carry?
About 285 vehicles per day (2021 count), of which roughly 10% are trucks.
How long is Rs 989 SE 160 Ave over S. Fork Ninnescah River?
The structure is 678 ft (206.8 m) long with a longest span of 70 ft (21.3 m) and a deck 26 ft wide.
Who owns Rs 989 SE 160 Ave over S. Fork Ninnescah River?
It is owned by the County Highway Agency.