Rs 303 SE 100 Ave over S. Fork Ninnescah River
GoodPosted for loadKingman County, Kansas · 1.5S of Murdock · Structure no. 000000000480160
- Built
- 1958
- 67 years old
- Condition
- Good
- inspected January 2023
- Type
- Tee Beam
- Concrete Continuous
- Length
- 567 ft
- 10 main spans
- Daily traffic
- 215
- 2021 count
- Owner
- County
- County Highway Agency
About this bridge
Rs 303 SE 100 Ave over S. Fork Ninnescah River is a concrete continuous tee beam carrying Rs 303 SE 100 Ave over S. Fork Ninnescah River in Kingman County, Kansas. It was built in 1958, so it is 67 years old, older than the Kansas average of 52.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. Its operating status is: posted for load restriction.
It carries about 215 vehicles a day, roughly 10% of them trucks, projected to reach 160 by 2043. The structure is 567 ft (172.8 m) long and 26 ft wide. If it were closed, the detour would be 3.7 mi (6 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Rs 303 SE 100 Ave over S. Fork Ninnescah River built?
It was built in 1958, making it 67 years old in 2025.
What condition is Rs 303 SE 100 Ave over S. Fork Ninnescah River in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in January 2023.
How much traffic does Rs 303 SE 100 Ave over S. Fork Ninnescah River carry?
About 215 vehicles per day (2021 count), of which roughly 10% are trucks.
How long is Rs 303 SE 100 Ave over S. Fork Ninnescah River?
The structure is 567 ft (172.8 m) long with a longest span of 59 ft (18 m) and a deck 26 ft wide.
Who owns Rs 303 SE 100 Ave over S. Fork Ninnescah River?
It is owned by the County Highway Agency.