Local Rd. 120 over Southside Ditch
FairPosted for loadKearny County, Kansas · 1.0W 2.6S of Lakin · Structure no. 000470389705900
- Built
- 1966
- 59 years old
- Condition
- Fair
- inspected November 2023
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 27 ft
- 1 main span
- Daily traffic
- 25
- 2018 count
- Owner
- County
- County Highway Agency
About this bridge
Local Rd. 120 over Southside Ditch is a steel stringer/multi-beam or girder carrying Local Rd. 120 over Southside Ditch in Kearny County, Kansas. It was built in 1966, so it is 59 years old, older than the Kansas average of 52.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.
It carries about 25 vehicles a day, roughly 5% of them trucks, projected to reach 25 by 2041. The structure is 27 ft (8.1 m) long and 26 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Local Rd. 120 over Southside Ditch built?
It was built in 1966, making it 59 years old in 2025.
What condition is Local Rd. 120 over Southside Ditch in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in November 2023.
How much traffic does Local Rd. 120 over Southside Ditch carry?
About 25 vehicles per day (2018 count), of which roughly 5% are trucks.
How long is Local Rd. 120 over Southside Ditch?
The structure is 27 ft (8.1 m) long with a longest span of 25 ft (7.5 m) and a deck 26 ft wide.
Who owns Local Rd. 120 over Southside Ditch?
It is owned by the County Highway Agency.