US 69 HWY SB over Indian Creek Drainage
FairJohnson County, Kansas · 0.38 MI S I435 · Structure no. 999906900461301
- Built
- 1973
- 52 years old, rebuilt 1985
- Condition
- Fair
- inspected July 2024
- Type
- Slab
- Concrete Continuous
- Length
- 153 ft
- 3 main spans
- Daily traffic
- 43,000
- 2023 count
- Owner
- State
- State Highway Agency
About this bridge
US 69 HWY SB over Indian Creek Drainage is a concrete continuous slab carrying US 69 HWY SB over Indian Creek Drainage in Johnson County, Kansas. It was built in 1973 and reconstructed in 1985, so it is 52 years old, younger than the Kansas average of 52.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 43,000 vehicles a day, roughly 5% of them trucks, projected to reach 57,915 by 2044. The structure is 153 ft (46.6 m) long and 65 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was US 69 HWY SB over Indian Creek Drainage built?
It was built in 1973, making it 52 years old in 2025. It was reconstructed in 1985.
What condition is US 69 HWY SB over Indian Creek Drainage in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in July 2024.
How much traffic does US 69 HWY SB over Indian Creek Drainage carry?
About 43,000 vehicles per day (2023 count), of which roughly 5% are trucks.
How long is US 69 HWY SB over Indian Creek Drainage?
The structure is 153 ft (46.6 m) long with a longest span of 60 ft (18.3 m) and a deck 65 ft wide.
Who owns US 69 HWY SB over Indian Creek Drainage?
It is owned by the State Highway Agency.