US Bridges

Holiday Dr. over Drainage

Good

Johnson County, Kansas · .5 Miles West of I-435 · Structure no. 526350460000063

Built
2007
18 years old
Condition
Good
inspected March 2024
Type
Culvert
Concrete
Length
29 ft
2 main spans
Daily traffic
4,210
2017 count
Owner
City
City or Municipal Highway Agency

About this bridge

Holiday Dr. over Drainage is a concrete culvert carrying Holiday Dr. over Drainage in Johnson County, Kansas. It was built in 2007, so it is 18 years old, younger than the Kansas average of 52.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 4,210 vehicles a day, roughly 6% of them trucks, projected to reach 5,000 by 2044. The structure is 29 ft (8.8 m) long. If it were closed, the detour would be 3.1 mi (5 km).

CarriesHoliday Dr.
CrossesDrainage
Location.5 Miles West of I-435
RouteCity Street 0
StateKansas
Coordinates39.03941, -94.80466
Functional classUrban Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Culvert7 GoodSome minor problems.
Last inspectionMarch 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating50.3 US tons
Inventory rating30.1 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans2
Design loadHS 20
Structure length29 ft (8.8 m)
Longest span14 ft (4.2 m)
Deck width0 ft (0 m)
Roadway width0 ft (0 m)
Vertical clearance over deck100 ft (30.5 m)

Traffic and service

Average daily traffic4,210 (2017)
Projected traffic5,000 by 2044
Trucks6%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesWaterway
Detour if closed3.1 mi (5 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Holiday Dr. over Drainage built?

It was built in 2007, making it 18 years old in 2025.

What condition is Holiday Dr. over Drainage in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in March 2024.

How much traffic does Holiday Dr. over Drainage carry?

About 4,210 vehicles per day (2017 count), of which roughly 6% are trucks.

How long is Holiday Dr. over Drainage?

The structure is 29 ft (8.8 m) long with a longest span of 14 ft (4.2 m).

Who owns Holiday Dr. over Drainage?

It is owned by the City or Municipal Highway Agency.