US Bridges

95th Street over Marshall Drive

Good

Johnson County, Kansas · 400 West of I-35 · Structure no. 415700462824005

Built
2016
9 years old
Condition
Good
inspected November 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
64 ft
1 main span
Daily traffic
36,000
2016 count
Owner
City
City or Municipal Highway Agency

About this bridge

95th Street over Marshall Drive is a prestressed concrete stringer/multi-beam or girder carrying 95th Street over Marshall Drive in Johnson County, Kansas. It was built in 2016, so it is 9 years old, younger than the Kansas average of 52.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 36,000 vehicles a day, roughly 3% of them trucks, projected to reach 44,150 by 2043. The structure is 64 ft (19.6 m) long and 135 ft wide. If it were closed, the detour would be 3.7 mi (6 km).

Carries95th Street
CrossesMarshall Drive
Location400 West of I-35
RouteCity Street 2824
StateKansas
Coordinates38.9565, -94.73455
Functional classUrban Minor Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Last inspectionNovember 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation8: Equal to present desirable criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Approach roadway alignment8: Equal to present desirable criteria
Operating rating67.1 US tons
Inventory rating40.1 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHL 93
Structure length64 ft (19.6 m)
Longest span62 ft (18.8 m)
Deck width135 ft (41.1 m)
Roadway width62 ft (18.9 m)
Vertical clearance over deck17 ft (5.2 m)

Traffic and service

Average daily traffic36,000 (2016)
Projected traffic44,150 by 2043
Trucks3%
Lanes on structure5
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesHighway
Detour if closed3.7 mi (6 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was 95th Street over Marshall Drive built?

It was built in 2016, making it 9 years old in 2025.

What condition is 95th Street over Marshall Drive in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in November 2023.

How much traffic does 95th Street over Marshall Drive carry?

About 36,000 vehicles per day (2016 count), of which roughly 3% are trucks.

How long is 95th Street over Marshall Drive?

The structure is 64 ft (19.6 m) long with a longest span of 62 ft (18.8 m) and a deck 135 ft wide.

Who owns 95th Street over Marshall Drive?

It is owned by the City or Municipal Highway Agency.