US Bridges

Local 270 T1 over Trib. to Straight Creek

Good

Jackson County, Kansas · 4.0N 3.6E of Holton · Structure no. 000430997203640

Built
2021
4 years old
Condition
Good
inspected January 2024
Type
Stringer/Multi-beam or Girder
Steel
Length
40 ft
1 main span
Daily traffic
35
2020 count
Owner
County
County Highway Agency

About this bridge

Local 270 T1 over Trib. to Straight Creek is a steel stringer/multi-beam or girder carrying Local 270 T1 over Trib. to Straight Creek in Jackson County, Kansas. It was built in 2021, so it is 4 years old, younger than the Kansas average of 52.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 35 vehicles a day, roughly 1% of them trucks, projected to reach 35 by 2044. The structure is 40 ft (12.2 m) long and 25 ft wide. If it were closed, the detour would be 3.7 mi (6 km).

CarriesLocal 270 T1
CrossesTrib. to Straight Creek
Location4.0N 3.6E of Holton
RouteCounty Highway 877
StateKansas
Coordinates39.53528, -95.68007
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionJanuary 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation8: Equal to present desirable criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating49.3 US tons
Inventory rating37.8 US tons

Structure

MaterialSteel
DeckConcrete, cast-in-place
Main spans1
Design loadHL 93
Structure length40 ft (12.2 m)
Longest span38 ft (11.7 m)
Deck width25 ft (7.5 m)
Roadway width24 ft (7.3 m)
Vertical clearance over deck100 ft (30.5 m)

Traffic and service

Average daily traffic35 (2020)
Projected traffic35 by 2044
Trucks1%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed3.7 mi (6 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Local 270 T1 over Trib. to Straight Creek built?

It was built in 2021, making it 4 years old in 2025.

What condition is Local 270 T1 over Trib. to Straight Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in January 2024.

How much traffic does Local 270 T1 over Trib. to Straight Creek carry?

About 35 vehicles per day (2020 count), of which roughly 1% are trucks.

How long is Local 270 T1 over Trib. to Straight Creek?

The structure is 40 ft (12.2 m) long with a longest span of 38 ft (11.7 m) and a deck 25 ft wide.

Who owns Local 270 T1 over Trib. to Straight Creek?

It is owned by the County Highway Agency.