US Bridges

IRR BIA RTE over Crow Creek

Good

Jackson County, Kansas · 0.1M W of "i" and 166 RD · Structure no. 00000000000B255

Built
2000
25 years old
Condition
Good
inspected December 2023
Type
Stringer/Multi-beam or Girder
Steel Continuous
Length
93 ft
3 main spans
Daily traffic
50
2023 count
Owner
Federal
Bureau of Indian Affairs

About this bridge

IRR BIA RTE over Crow Creek is a steel continuous stringer/multi-beam or girder carrying IRR BIA RTE over Crow Creek in Jackson County, Kansas. It was built in 2000, so it is 25 years old, younger than the Kansas average of 52.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 50 vehicles a day, roughly 1% of them trucks, projected to reach 55 by 2043. The structure is 93 ft (28.4 m) long and 30 ft wide. If it were closed, the detour would be 3.1 mi (5 km).

CarriesIRR BIA RTE
CrossesCrow Creek
Location0.1M W of "i" and 166 RD
RouteFederal Lands Road 908
StateKansas
Coordinates39.34694, -95.88743
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure8 Very GoodNo problems noted.
Channel and channel protection7 GoodSome minor problems.
Last inspectionDecember 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry7: Better than present minimum criteria
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating51.9 US tons
Inventory rating31 US tons

Structure

MaterialSteel Continuous
DeckConcrete, cast-in-place
Main spans3
Design loadHS 20
Structure length93 ft (28.4 m)
Longest span36 ft (11 m)
Deck width30 ft (9.2 m)
Roadway width28 ft (8.5 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic50 (2023)
Projected traffic55 by 2043
Trucks1%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed3.1 mi (5 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerBureau of Indian Affairs
Maintained byBureau of Indian Affairs
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was IRR BIA RTE over Crow Creek built?

It was built in 2000, making it 25 years old in 2025.

What condition is IRR BIA RTE over Crow Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in December 2023.

How much traffic does IRR BIA RTE over Crow Creek carry?

About 50 vehicles per day (2023 count), of which roughly 1% are trucks.

How long is IRR BIA RTE over Crow Creek?

The structure is 93 ft (28.4 m) long with a longest span of 36 ft (11 m) and a deck 30 ft wide.

Who owns IRR BIA RTE over Crow Creek?

It is owned by the Bureau of Indian Affairs.