US Bridges

K-2 HWY over East Sand Creek Drainage

Good

Harper County, Kansas · 0.20 MI NE Njct US-160 · Structure no. 999900200390521

Built
1992
33 years old
Condition
Good
inspected August 2023
Type
Culvert
Concrete
Length
37 ft
2 main spans
Daily traffic
2,657
2023 count
Owner
State
State Highway Agency

About this bridge

K-2 HWY over East Sand Creek Drainage is a concrete culvert carrying K-2 HWY over East Sand Creek Drainage in Harper County, Kansas. It was built in 1992, so it is 33 years old, younger than the Kansas average of 52.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 2,657 vehicles a day, roughly 15% of them trucks, projected to reach 2,878 by 2044. The structure is 37 ft (11.3 m) long and 121 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesK-2 HWY
CrossesEast Sand Creek Drainage
Location0.20 MI NE Njct US-160
RouteState Highway 2
StateKansas
Coordinates37.28556, -98.01778
Functional classRural Minor Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection7 GoodSome minor problems.
Culvert7 GoodSome minor problems.
Last inspectionAugust 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment4: Meets minimum tolerable limits to be left in place as is
Operating rating98 US tons
Inventory rating59 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckConcrete, cast-in-place
Main spans2
Design loadHS 20
Structure length37 ft (11.3 m)
Longest span12 ft (3.7 m)
Deck width121 ft (36.9 m)
Roadway width30 ft (9.1 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic2,657 (2023)
Projected traffic2,878 by 2044
Trucks15%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was K-2 HWY over East Sand Creek Drainage built?

It was built in 1992, making it 33 years old in 2025.

What condition is K-2 HWY over East Sand Creek Drainage in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in August 2023.

How much traffic does K-2 HWY over East Sand Creek Drainage carry?

About 2,657 vehicles per day (2023 count), of which roughly 15% are trucks.

How long is K-2 HWY over East Sand Creek Drainage?

The structure is 37 ft (11.3 m) long with a longest span of 12 ft (3.7 m) and a deck 121 ft wide.

Who owns K-2 HWY over East Sand Creek Drainage?

It is owned by the State Highway Agency.