Rs 302 NW 100 RD over Trib. to Rush Creek
GoodPosted for loadHarper County, Kansas · 2.0N 1.5E Crystal Springs · Structure no. 000000000390220
- Built
- 1957
- 68 years old
- Condition
- Good
- inspected April 2023
- Type
- Slab
- Concrete Continuous
- Length
- 80 ft
- 3 main spans
- Daily traffic
- 138
- 2021 count
- Owner
- County
- County Highway Agency
About this bridge
Rs 302 NW 100 RD over Trib. to Rush Creek is a concrete continuous slab carrying Rs 302 NW 100 RD over Trib. to Rush Creek in Harper County, Kansas. It was built in 1957, so it is 68 years old, older than the Kansas average of 52.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. Its operating status is: posted for load restriction.
It carries about 138 vehicles a day, projected to reach 160 by 2043. The structure is 80 ft (24.4 m) long and 28 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Rs 302 NW 100 RD over Trib. to Rush Creek built?
It was built in 1957, making it 68 years old in 2025.
What condition is Rs 302 NW 100 RD over Trib. to Rush Creek in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in April 2023.
How much traffic does Rs 302 NW 100 RD over Trib. to Rush Creek carry?
About 138 vehicles per day (2021 count).
How long is Rs 302 NW 100 RD over Trib. to Rush Creek?
The structure is 80 ft (24.4 m) long with a longest span of 30 ft (9.1 m) and a deck 28 ft wide.
Who owns Rs 302 NW 100 RD over Trib. to Rush Creek?
It is owned by the County Highway Agency.