US Bridges

E Road (west) over Trib. to Saline River

Good

Graham County, Kansas · 4.0E of St. Peter · Structure no. 000330531804120

Built
1981
44 years old
Condition
Good
inspected May 2024
Type
Culvert
Concrete
Length
25 ft
2 main spans
Daily traffic
45
2020 count
Owner
County
County Highway Agency

About this bridge

E Road (west) over Trib. to Saline River is a concrete culvert carrying E Road (west) over Trib. to Saline River in Graham County, Kansas. It was built in 1981, so it is 44 years old, younger than the Kansas average of 52.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 45 vehicles a day, projected to reach 45 by 2044. The structure is 25 ft (7.6 m) long and 28 ft wide. If it were closed, the detour would be 8.1 mi (13 km).

CarriesE Road (west)
CrossesTrib. to Saline River
Location4.0E of St. Peter
RouteCounty Highway 0
StateKansas
Coordinates39.18984, -100.01972
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Culvert7 GoodSome minor problems.
Last inspectionMay 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation4: Meets minimum tolerable limits to be left in place as is
Deck geometry6: Equal to present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating28.1 US tons
Inventory rating16.8 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans2
Design loadH 20
Structure length25 ft (7.6 m)
Longest span12 ft (3.6 m)
Deck width28 ft (8.5 m)
Roadway width26 ft (7.9 m)
Vertical clearance over deck100 ft (30.5 m)

Traffic and service

Average daily traffic45 (2020)
Projected traffic45 by 2044
Trucks0%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed8.1 mi (13 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusHistorical significance not determinable at this time
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was E Road (west) over Trib. to Saline River built?

It was built in 1981, making it 44 years old in 2025.

What condition is E Road (west) over Trib. to Saline River in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in May 2024.

How much traffic does E Road (west) over Trib. to Saline River carry?

About 45 vehicles per day (2020 count).

How long is E Road (west) over Trib. to Saline River?

The structure is 25 ft (7.6 m) long with a longest span of 12 ft (3.6 m) and a deck 28 ft wide.

Who owns E Road (west) over Trib. to Saline River?

It is owned by the County Highway Agency.