US Bridges

SB US-59 HWY over Stafford Road

Good

Franklin County, Kansas · 5.7M N of I-35 · Structure no. 999905900301181

Built
2010
15 years old
Condition
Good
inspected February 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete Continuous
Length
225 ft
3 main spans
Daily traffic
3,907
2023 count
Owner
State
State Highway Agency

About this bridge

SB US-59 HWY over Stafford Road is a prestressed concrete continuous stringer/multi-beam or girder carrying SB US-59 HWY over Stafford Road in Franklin County, Kansas. It was built in 2010, so it is 15 years old, younger than the Kansas average of 52.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 3,907 vehicles a day, roughly 7% of them trucks, projected to reach 5,582 by 2044. The structure is 225 ft (68.7 m) long and 42 ft wide.

CarriesSB US-59 HWY
CrossesStafford Road
Location5.7M N of I-35
RouteU.S. Route 59
StateKansas
Coordinates38.70944, -95.26833
Functional classRural Principal Arterial - Other

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Last inspectionFebruary 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating59 US tons
Inventory rating32.2 US tons

Structure

MaterialPrestressed Concrete Continuous
DeckNot applicable
Main spans3
Design loadHL 93
Structure length225 ft (68.7 m)
Longest span83 ft (25.3 m)
Deck width42 ft (12.8 m)
Roadway width40 ft (12.2 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic3,907 (2023)
Projected traffic5,582 by 2044
Trucks7%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed—
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was SB US-59 HWY over Stafford Road built?

It was built in 2010, making it 15 years old in 2025.

What condition is SB US-59 HWY over Stafford Road in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in February 2024.

How much traffic does SB US-59 HWY over Stafford Road carry?

About 3,907 vehicles per day (2023 count), of which roughly 7% are trucks.

How long is SB US-59 HWY over Stafford Road?

The structure is 225 ft (68.7 m) long with a longest span of 83 ft (25.3 m) and a deck 42 ft wide.

Who owns SB US-59 HWY over Stafford Road?

It is owned by the State Highway Agency.