7th Road over Trib. to Plum Creek
FairEllsworth County, Kansas · 2.3E 2.8S of Holyrood · Structure no. 000270709005004
- Built
- 2000
- 25 years old
- Condition
- Fair
- inspected March 2024
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 59 ft
- 2 main spans
- Daily traffic
- 30
- 2020 count
- Owner
- County
- County Highway Agency
About this bridge
7th Road over Trib. to Plum Creek is a steel continuous stringer/multi-beam or girder carrying 7th Road over Trib. to Plum Creek in Ellsworth County, Kansas. It was built in 2000, so it is 25 years old, younger than the Kansas average of 52.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 30 vehicles a day, roughly 5% of them trucks, projected to reach 35 by 2044. The structure is 59 ft (17.9 m) long and 25 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was 7th Road over Trib. to Plum Creek built?
It was built in 2000, making it 25 years old in 2025.
What condition is 7th Road over Trib. to Plum Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in March 2024.
How much traffic does 7th Road over Trib. to Plum Creek carry?
About 30 vehicles per day (2020 count), of which roughly 5% are trucks.
How long is 7th Road over Trib. to Plum Creek?
The structure is 59 ft (17.9 m) long with a longest span of 29 ft (8.8 m) and a deck 25 ft wide.
Who owns 7th Road over Trib. to Plum Creek?
It is owned by the County Highway Agency.