US Bridges

Pioneer over Trib. to Snake Creek

Fair

Elk County, Kansas · 4.5N 0.7E of Howard · Structure no. 000250937706385

Built
1948
77 years old
Condition
Fair
inspected August 2024
Type
Slab
Concrete
Length
21 ft
1 main span
Daily traffic
10
2019 count
Owner
County
County Highway Agency

About this bridge

Pioneer over Trib. to Snake Creek is a concrete slab carrying Pioneer over Trib. to Snake Creek in Elk County, Kansas. It was built in 1948, so it is 77 years old, older than the Kansas average of 52.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 10 vehicles a day, roughly 5% of them trucks, projected to reach 12 by 2044. The structure is 21 ft (6.4 m) long and 26 ft wide. If it were closed, the detour would be 3.1 mi (5 km).

CarriesPioneer
CrossesTrib. to Snake Creek
Location4.5N 0.7E of Howard
RouteCounty Highway 2518
StateKansas
Coordinates37.54089, -96.24017
Functional classRural Minor Collector

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Channel and channel protection5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Last inspectionAugust 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; action required to protect exposed foundations
Structural evaluation5: Somewhat better than minimum adequacy to tolerate being left in place as is
Deck geometry6: Equal to present minimum criteria
Waterway adequacy6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating36 US tons
Inventory rating36 US tons

Structure

Structure typeSlab
MaterialConcrete
DeckConcrete, cast-in-place
Main spans1
Design loadUnknown
Structure length21 ft (6.4 m)
Longest span20 ft (6 m)
Deck width26 ft (7.8 m)
Roadway width24 ft (7.3 m)
Vertical clearance over deck100 ft (30.5 m)

Traffic and service

Average daily traffic10 (2019)
Projected traffic12 by 2044
Trucks5%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed3.1 mi (5 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Pioneer over Trib. to Snake Creek built?

It was built in 1948, making it 77 years old in 2025.

What condition is Pioneer over Trib. to Snake Creek in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in August 2024.

How much traffic does Pioneer over Trib. to Snake Creek carry?

About 10 vehicles per day (2019 count), of which roughly 5% are trucks.

How long is Pioneer over Trib. to Snake Creek?

The structure is 21 ft (6.4 m) long with a longest span of 20 ft (6 m) and a deck 26 ft wide.

Who owns Pioneer over Trib. to Snake Creek?

It is owned by the County Highway Agency.