US Bridges

Road 28 over Trib. to Indian Creek

Good

Elk County, Kansas · 2.1S of Fall River · Structure no. 000000000250340

Built
2004
21 years old
Condition
Good
inspected August 2024
Type
Culvert
Concrete
Length
26 ft
2 main spans
Daily traffic
240
2019 count
Owner
County
County Highway Agency

About this bridge

Road 28 over Trib. to Indian Creek is a concrete culvert carrying Road 28 over Trib. to Indian Creek in Elk County, Kansas. It was built in 2004, so it is 21 years old, younger than the Kansas average of 52.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 240 vehicles a day, roughly 10% of them trucks, projected to reach 290 by 2044. The structure is 26 ft (7.9 m) long and 35 ft wide. If it were closed, the detour would be 3.7 mi (6 km).

CarriesRoad 28
CrossesTrib. to Indian Creek
Location2.1S of Fall River
RouteCounty Highway 679
StateKansas
Coordinates37.57434, -96.03321
Functional classRural Major Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Culvert7 GoodSome minor problems.
Last inspectionAugust 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy5: Somewhat better than minimum adequacy to tolerate being left in place as is
Approach roadway alignment8: Equal to present desirable criteria
Operating rating106 US tons
Inventory rating63.5 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckConcrete, cast-in-place
Main spans2
Design loadHS 20
Structure length26 ft (7.9 m)
Longest span12 ft (3.8 m)
Deck width35 ft (10.8 m)
Roadway width28 ft (8.5 m)
Vertical clearance over deck100 ft (30.5 m)

Traffic and service

Average daily traffic240 (2019)
Projected traffic290 by 2044
Trucks10%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed3.7 mi (6 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Road 28 over Trib. to Indian Creek built?

It was built in 2004, making it 21 years old in 2025.

What condition is Road 28 over Trib. to Indian Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in August 2024.

How much traffic does Road 28 over Trib. to Indian Creek carry?

About 240 vehicles per day (2019 count), of which roughly 10% are trucks.

How long is Road 28 over Trib. to Indian Creek?

The structure is 26 ft (7.9 m) long with a longest span of 12 ft (3.8 m) and a deck 35 ft wide.

Who owns Road 28 over Trib. to Indian Creek?

It is owned by the County Highway Agency.