BIA IRR RTE 826 over Squaw Creek
GoodDoniphan County, Kansas · 0.8KM W of HWY 315 & 325 · Structure no. 00000000000B318
- Built
- 2004
- 21 years old
- Condition
- Good
- inspected December 2023
- Type
- Slab
- Concrete Continuous
- Length
- 113 ft
- 3 main spans
- Daily traffic
- 30
- 2023 count
- Owner
- Federal
- Bureau of Indian Affairs
About this bridge
BIA IRR RTE 826 over Squaw Creek is a concrete continuous slab carrying BIA IRR RTE 826 over Squaw Creek in Doniphan County, Kansas. It was built in 2004, so it is 21 years old, younger than the Kansas average of 52.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 30 vehicles a day, roughly 15% of them trucks, projected to reach 60 by 2043. The structure is 113 ft (34.3 m) long and 26 ft wide. If it were closed, the detour would be 3.7 mi (6 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 8 Very Good | No problems noted. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was BIA IRR RTE 826 over Squaw Creek built?
It was built in 2004, making it 21 years old in 2025.
What condition is BIA IRR RTE 826 over Squaw Creek in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in December 2023.
How much traffic does BIA IRR RTE 826 over Squaw Creek carry?
About 30 vehicles per day (2023 count), of which roughly 15% are trucks.
How long is BIA IRR RTE 826 over Squaw Creek?
The structure is 113 ft (34.3 m) long with a longest span of 44 ft (13.4 m) and a deck 26 ft wide.
Who owns BIA IRR RTE 826 over Squaw Creek?
It is owned by the Bureau of Indian Affairs.