US Bridges

Paint RD (R6-S80) over Chapman Creek

Good

Dickinson County, Kansas · 3120 Paint RD · Structure no. 000210851004308

Built
2004
21 years old
Condition
Good
inspected March 2023
Type
Slab
Concrete Continuous
Length
164 ft
3 main spans
Daily traffic
30
2011 count
Owner
County
County Highway Agency

About this bridge

Paint RD (R6-S80) over Chapman Creek is a concrete continuous slab carrying Paint RD (R6-S80) over Chapman Creek in Dickinson County, Kansas. It was built in 2004, so it is 21 years old, younger than the Kansas average of 52.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 30 vehicles a day, projected to reach 36 by 2043. The structure is 164 ft (49.9 m) long and 28 ft wide. If it were closed, the detour would be 3.1 mi (5 km).

CarriesPaint RD (R6-S80)
CrossesChapman Creek
Location3120 Paint RD
RouteCounty Highway 2109
StateKansas
Coordinates39.0486, -97.05378
Functional classRural Minor Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Channel and channel protection7 GoodSome minor problems.
Last inspectionMarch 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation8: Equal to present desirable criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment7: Better than present minimum criteria
Operating rating72.5 US tons
Inventory rating43.4 US tons

Structure

Structure typeSlab
MaterialConcrete Continuous
DeckConcrete, cast-in-place
Main spans3
Design loadHS 20
Structure length164 ft (49.9 m)
Longest span64 ft (19.5 m)
Deck width28 ft (8.6 m)
Roadway width26 ft (8 m)
Vertical clearance over deck100 ft (30.5 m)

Traffic and service

Average daily traffic30 (2011)
Projected traffic36 by 2043
Trucks0%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed3.1 mi (5 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Paint RD (R6-S80) over Chapman Creek built?

It was built in 2004, making it 21 years old in 2025.

What condition is Paint RD (R6-S80) over Chapman Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in March 2023.

How much traffic does Paint RD (R6-S80) over Chapman Creek carry?

About 30 vehicles per day (2011 count).

How long is Paint RD (R6-S80) over Chapman Creek?

The structure is 164 ft (49.9 m) long with a longest span of 64 ft (19.5 m) and a deck 28 ft wide.

Who owns Paint RD (R6-S80) over Chapman Creek?

It is owned by the County Highway Agency.