US Bridges

US-81 HWY over West Pipe Creek Drainage

Good

Cloud County, Kansas · 2.84 MI N US-24 · Structure no. 999908100150611

Built
1996
29 years old
Condition
Good
inspected December 2024
Type
Culvert
Concrete
Length
43 ft
3 main spans
Daily traffic
3,083
2023 count
Owner
State
State Highway Agency

About this bridge

US-81 HWY over West Pipe Creek Drainage is a concrete culvert carrying US-81 HWY over West Pipe Creek Drainage in Cloud County, Kansas. It was built in 1996, so it is 29 years old, younger than the Kansas average of 52.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 3,083 vehicles a day, roughly 24% of them trucks, projected to reach 3,992 by 2044. The structure is 43 ft (13.1 m) long and 175 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesUS-81 HWY
CrossesWest Pipe Creek Drainage
Location2.84 MI N US-24
RouteU.S. Route 81
StateKansas
Coordinates39.40611, -97.66639
Functional classRural Principal Arterial - Other

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection7 GoodSome minor problems.
Culvert7 GoodSome minor problems.
Last inspectionDecember 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry9: Superior to present desirable criteria
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating110.1 US tons
Inventory rating75.9 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckConcrete, cast-in-place
Main spans3
Design loadHS 20
Structure length43 ft (13.1 m)
Longest span12 ft (3.7 m)
Deck width175 ft (53.3 m)
Roadway width80 ft (24.4 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic3,083 (2023)
Projected traffic3,992 by 2044
Trucks24%
Lanes on structure4
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was US-81 HWY over West Pipe Creek Drainage built?

It was built in 1996, making it 29 years old in 2025.

What condition is US-81 HWY over West Pipe Creek Drainage in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in December 2024.

How much traffic does US-81 HWY over West Pipe Creek Drainage carry?

About 3,083 vehicles per day (2023 count), of which roughly 24% are trucks.

How long is US-81 HWY over West Pipe Creek Drainage?

The structure is 43 ft (13.1 m) long with a longest span of 12 ft (3.7 m) and a deck 175 ft wide.

Who owns US-81 HWY over West Pipe Creek Drainage?

It is owned by the State Highway Agency.