3 Road over Trib S Fork Republican R
FairPosted for loadCheyenne County, Kansas · 4.0S 11.0W St. Francis · Structure no. 000120321003388
- Built
- 1955
- 70 years old
- Condition
- Fair
- inspected January 2025
- Type
- Stringer/Multi-beam or Girder
- Wood or Timber
- Length
- 25 ft
- 1 main span
- Daily traffic
- 30
- 2020 count
- Owner
- County
- County Highway Agency
About this bridge
3 Road over Trib S Fork Republican R is a wood or timber stringer/multi-beam or girder carrying 3 Road over Trib S Fork Republican R in Cheyenne County, Kansas. It was built in 1955, so it is 70 years old, older than the Kansas average of 52.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.
It carries about 30 vehicles a day, projected to reach 35 by 2045. The structure is 25 ft (7.5 m) long and 24 ft wide. If it were closed, the detour would be 3.7 mi (6 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was 3 Road over Trib S Fork Republican R built?
It was built in 1955, making it 70 years old in 2025.
What condition is 3 Road over Trib S Fork Republican R in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in January 2025.
How much traffic does 3 Road over Trib S Fork Republican R carry?
About 30 vehicles per day (2020 count).
How long is 3 Road over Trib S Fork Republican R?
The structure is 25 ft (7.5 m) long with a longest span of 22 ft (6.8 m) and a deck 24 ft wide.
Who owns 3 Road over Trib S Fork Republican R?
It is owned by the County Highway Agency.