W Scammon RD over Lightning Creek
FairPosted for loadCherokee County, Kansas · 1.5N 1.5E of Sherman City · Structure no. 000000000110140
- Built
- 1960
- 65 years old
- Condition
- Fair
- inspected September 2023
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 255 ft
- 5 main spans
- Daily traffic
- 100
- 2019 count
- Owner
- County
- County Highway Agency
About this bridge
W Scammon RD over Lightning Creek is a steel continuous stringer/multi-beam or girder carrying W Scammon RD over Lightning Creek in Cherokee County, Kansas. It was built in 1960, so it is 65 years old, older than the Kansas average of 52.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.
It carries about 100 vehicles a day, roughly 10% of them trucks, projected to reach 120 by 2043. The structure is 255 ft (77.7 m) long and 26 ft wide. If it were closed, the detour would be 3.7 mi (6 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was W Scammon RD over Lightning Creek built?
It was built in 1960, making it 65 years old in 2025.
What condition is W Scammon RD over Lightning Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in September 2023.
How much traffic does W Scammon RD over Lightning Creek carry?
About 100 vehicles per day (2019 count), of which roughly 10% are trucks.
How long is W Scammon RD over Lightning Creek?
The structure is 255 ft (77.7 m) long with a longest span of 55 ft (16.7 m) and a deck 26 ft wide.
Who owns W Scammon RD over Lightning Creek?
It is owned by the County Highway Agency.