US Bridges

SE Stone Road over Creek

Good

Butler County, Kansas · 2.0E of El Dorado · Structure no. 000080875706007

Built
2002
23 years old
Condition
Good
inspected February 2025
Type
Culvert
Concrete
Length
64 ft
5 main spans
Daily traffic
50
2023 count
Owner
County
County Highway Agency

About this bridge

SE Stone Road over Creek is a concrete culvert carrying SE Stone Road over Creek in Butler County, Kansas. It was built in 2002, so it is 23 years old, younger than the Kansas average of 52.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 50 vehicles a day, projected to reach 30 by 2045. The structure is 64 ft (19.5 m) long and 32 ft wide. If it were closed, the detour would be 3.7 mi (6 km).

CarriesSE Stone Road
CrossesCreek
Location2.0E of El Dorado
RouteCounty Highway 0
StateKansas
Coordinates37.81375, -96.83003
Functional classUrban Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Culvert7 GoodSome minor problems.
Last inspectionFebruary 2025
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry7: Better than present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating92 US tons
Inventory rating55.2 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans5
Design loadHS 20
Structure length64 ft (19.5 m)
Longest span12 ft (3.6 m)
Deck width32 ft (9.9 m)
Roadway width28 ft (8.5 m)
Vertical clearance over deck100 ft (30.5 m)

Traffic and service

Average daily traffic50 (2023)
Projected traffic30 by 2045
Trucks0%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed3.7 mi (6 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was SE Stone Road over Creek built?

It was built in 2002, making it 23 years old in 2025.

What condition is SE Stone Road over Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in February 2025.

How much traffic does SE Stone Road over Creek carry?

About 50 vehicles per day (2023 count).

How long is SE Stone Road over Creek?

The structure is 64 ft (19.5 m) long with a longest span of 12 ft (3.6 m) and a deck 32 ft wide.

Who owns SE Stone Road over Creek?

It is owned by the County Highway Agency.