US Bridges

Rs 64 Dewberry Rd. over Trib. to Pony Creek

Good

Brown County, Kansas · 2.3N of Morrill · Structure no. 000000000070B23

Built
2019
6 years old
Condition
Good
inspected January 2025
Type
Stringer/Multi-beam or Girder
Steel
Length
90 ft
1 main span
Daily traffic
202
2004 count
Owner
County
County Highway Agency

About this bridge

Rs 64 Dewberry Rd. over Trib. to Pony Creek is a steel stringer/multi-beam or girder carrying Rs 64 Dewberry Rd. over Trib. to Pony Creek in Brown County, Kansas. It was built in 2019, so it is 6 years old, younger than the Kansas average of 52.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 202 vehicles a day, roughly 10% of them trucks, projected to reach 224 by 2044. The structure is 90 ft (27.4 m) long and 27 ft wide. If it were closed, the detour would be 3.1 mi (5 km).

CarriesRs 64 Dewberry Rd.
CrossesTrib. to Pony Creek
Location2.3N of Morrill
RouteCounty Highway 64
StateKansas
Coordinates39.96559, -95.69309
Functional classRural Major Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Channel and channel protection7 GoodSome minor problems.
Last inspectionJanuary 2025
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation8: Equal to present desirable criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating48.9 US tons
Inventory rating37.8 US tons

Structure

MaterialSteel
DeckConcrete, cast-in-place
Main spans1
Design loadHL 93
Structure length90 ft (27.4 m)
Longest span88 ft (26.9 m)
Deck width27 ft (8.1 m)
Roadway width26 ft (7.9 m)
Vertical clearance over deck100 ft (30.5 m)

Traffic and service

Average daily traffic202 (2004)
Projected traffic224 by 2044
Trucks10%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed3.1 mi (5 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Rs 64 Dewberry Rd. over Trib. to Pony Creek built?

It was built in 2019, making it 6 years old in 2025.

What condition is Rs 64 Dewberry Rd. over Trib. to Pony Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in January 2025.

How much traffic does Rs 64 Dewberry Rd. over Trib. to Pony Creek carry?

About 202 vehicles per day (2004 count), of which roughly 10% are trucks.

How long is Rs 64 Dewberry Rd. over Trib. to Pony Creek?

The structure is 90 ft (27.4 m) long with a longest span of 88 ft (26.9 m) and a deck 27 ft wide.

Who owns Rs 64 Dewberry Rd. over Trib. to Pony Creek?

It is owned by the County Highway Agency.