US54 HWY (US69/K7) over Marmaton River Overflow
GoodBourbon County, Kansas · 0.57 MI N Sjct US69 EB · Structure no. 999905400060871
- Built
- 2003
- 22 years old
- Condition
- Good
- inspected February 2023
- Type
- Slab
- Concrete Continuous
- Length
- 268 ft
- 5 main spans
- Daily traffic
- 4,910
- 2023 count
- Owner
- State
- State Highway Agency
About this bridge
US54 HWY (US69/K7) over Marmaton River Overflow is a concrete continuous slab carrying US54 HWY (US69/K7) over Marmaton River Overflow in Bourbon County, Kansas. It was built in 2003, so it is 22 years old, younger than the Kansas average of 52.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 4,910 vehicles a day, roughly 18% of them trucks, projected to reach 5,991 by 2044. The structure is 268 ft (81.8 m) long and 39 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 8 Very Good | No problems noted. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was US54 HWY (US69/K7) over Marmaton River Overflow built?
It was built in 2003, making it 22 years old in 2025.
What condition is US54 HWY (US69/K7) over Marmaton River Overflow in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in February 2023.
How much traffic does US54 HWY (US69/K7) over Marmaton River Overflow carry?
About 4,910 vehicles per day (2023 count), of which roughly 18% are trucks.
How long is US54 HWY (US69/K7) over Marmaton River Overflow?
The structure is 268 ft (81.8 m) long with a longest span of 59 ft (18 m) and a deck 39 ft wide.
Who owns US54 HWY (US69/K7) over Marmaton River Overflow?
It is owned by the State Highway Agency.