U-56 HWY over Divrsion Cl and Ped Pass
GoodBarton County, Kansas · 10.90 MI NE Pawnee Coln · Structure no. 999905600050831
- Built
- 1992
- 33 years old
- Condition
- Good
- inspected October 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete Continuous
- Length
- 352 ft
- 5 main spans
- Daily traffic
- 3,636
- 2023 count
- Owner
- State
- State Highway Agency
About this bridge
U-56 HWY over Divrsion Cl and Ped Pass is a prestressed concrete continuous stringer/multi-beam or girder carrying U-56 HWY over Divrsion Cl and Ped Pass in Barton County, Kansas. It was built in 1992, so it is 33 years old, younger than the Kansas average of 52.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 3,636 vehicles a day, roughly 21% of them trucks, projected to reach 4,437 by 2044. The structure is 352 ft (107.4 m) long and 46 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was U-56 HWY over Divrsion Cl and Ped Pass built?
It was built in 1992, making it 33 years old in 2025.
What condition is U-56 HWY over Divrsion Cl and Ped Pass in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2024.
How much traffic does U-56 HWY over Divrsion Cl and Ped Pass carry?
About 3,636 vehicles per day (2023 count), of which roughly 21% are trucks.
How long is U-56 HWY over Divrsion Cl and Ped Pass?
The structure is 352 ft (107.4 m) long with a longest span of 70 ft (21.3 m) and a deck 46 ft wide.
Who owns U-56 HWY over Divrsion Cl and Ped Pass?
It is owned by the State Highway Agency.