Raber Road over Gangwer Drain
FairWhitley County, Indiana · 00.20 N Wait RD · Structure no. 9200045
- Built
- 1995
- 30 years old
- Condition
- Fair
- inspected March 2024
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 67 ft
- 1 main span
- Daily traffic
- 500
- 2014 count
- Owner
- County
- County Highway Agency
About this bridge
Raber Road over Gangwer Drain is a prestressed concrete box beam or girders - multiple carrying Raber Road over Gangwer Drain in Whitley County, Indiana. It was built in 1995, so it is 30 years old, younger than the Indiana average of 46.6 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 500 vehicles a day, roughly 4% of them trucks, projected to reach 825 by 2038. The structure is 67 ft (20.3 m) long and 28 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Raber Road over Gangwer Drain built?
It was built in 1995, making it 30 years old in 2025.
What condition is Raber Road over Gangwer Drain in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in March 2024.
How much traffic does Raber Road over Gangwer Drain carry?
About 500 vehicles per day (2014 count), of which roughly 4% are trucks.
How long is Raber Road over Gangwer Drain?
The structure is 67 ft (20.3 m) long with a longest span of 62 ft (18.8 m) and a deck 28 ft wide.
Who owns Raber Road over Gangwer Drain?
It is owned by the County Highway Agency.