US Bridges

CR 350W over Scipio Ditch

Fair

White County, Indiana · 00.03 S CR 250 S · Structure no. 9100160

Built
1996
29 years old
Condition
Fair
inspected October 2024
Type
Box Beam or Girders - Multiple
Prestressed Concrete
Length
64 ft
3 main spans
Daily traffic
110
2024 count
Owner
County
County Highway Agency

About this bridge

CR 350W over Scipio Ditch is a prestressed concrete box beam or girders - multiple carrying CR 350W over Scipio Ditch in White County, Indiana. It was built in 1996, so it is 29 years old, younger than the Indiana average of 46.6 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 110 vehicles a day, roughly 5% of them trucks, projected to reach 150 by 2044. The structure is 64 ft (19.5 m) long and 28 ft wide. If it were closed, the detour would be 0.6 mi (1 km).

CarriesCR 350W
CrossesScipio Ditch
Location00.03 S CR 250 S
RouteCounty Highway 125
StateIndiana
Coordinates40.71342, -86.93739
Functional classRural Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Superstructure5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Substructure7 GoodSome minor problems.
Channel and channel protection7 GoodSome minor problems.
Last inspectionOctober 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation5: Somewhat better than minimum adequacy to tolerate being left in place as is
Deck geometry6: Equal to present minimum criteria
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating75.4 US tons
Inventory rating45.1 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, precast panels
Main spans3
Design loadHS 20
Structure length64 ft (19.5 m)
Longest span24 ft (7.3 m)
Deck width28 ft (8.5 m)
Roadway width28 ft (8.5 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic110 (2024)
Projected traffic150 by 2044
Trucks5%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed0.6 mi (1 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedRehabilitation because of general structure deterioration or inadequate strength
Estimated improvement cost$550,000 (2024 estimate)
NavigationNo navigation control on waterway

Frequently asked questions

When was CR 350W over Scipio Ditch built?

It was built in 1996, making it 29 years old in 2025.

What condition is CR 350W over Scipio Ditch in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in October 2024.

How much traffic does CR 350W over Scipio Ditch carry?

About 110 vehicles per day (2024 count), of which roughly 5% are trucks.

How long is CR 350W over Scipio Ditch?

The structure is 64 ft (19.5 m) long with a longest span of 24 ft (7.3 m) and a deck 28 ft wide.

Who owns CR 350W over Scipio Ditch?

It is owned by the County Highway Agency.