US Bridges

New Harmony Road over Squaw Creek

Fair

Warrick County, Indiana · 0.35 MI E Weyerbacher · Structure no. 8700187

Built
1990
35 years old
Condition
Fair
inspected August 2023
Type
Culvert
Steel
Length
28 ft
2 main spans
Daily traffic
170
2021 count
Owner
County
County Highway Agency

About this bridge

New Harmony Road over Squaw Creek is a steel culvert carrying New Harmony Road over Squaw Creek in Warrick County, Indiana. It was built in 1990, so it is 35 years old, younger than the Indiana average of 46.6 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 170 vehicles a day, roughly 45% of them trucks, projected to reach 279 by 2041. The structure is 28 ft (8.5 m) long and 45 ft wide. If it were closed, the detour would be 3.7 mi (6 km).

CarriesNew Harmony Road
CrossesSquaw Creek
Location0.35 MI E Weyerbacher
RouteCounty Highway 0
StateIndiana
Coordinates38.09287, -87.35245
Functional classRural Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Culvert6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionAugust 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Deck geometry9: Superior to present desirable criteria
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60.1 US tons
Inventory rating35.9 US tons

Structure

Structure typeCulvert
MaterialSteel
DeckNot applicable
Main spans2
Design loadUnknown
Structure length28 ft (8.5 m)
Longest span14 ft (4.2 m)
Deck width45 ft (13.7 m)
Roadway width45 ft (13.6 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic170 (2021)
Projected traffic279 by 2041
Trucks45%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed3.7 mi (6 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was New Harmony Road over Squaw Creek built?

It was built in 1990, making it 35 years old in 2025.

What condition is New Harmony Road over Squaw Creek in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in August 2023.

How much traffic does New Harmony Road over Squaw Creek carry?

About 170 vehicles per day (2021 count), of which roughly 45% are trucks.

How long is New Harmony Road over Squaw Creek?

The structure is 28 ft (8.5 m) long with a longest span of 14 ft (4.2 m) and a deck 45 ft wide.

Who owns New Harmony Road over Squaw Creek?

It is owned by the County Highway Agency.