Spurgeon Road over Smith Fork
FairWarrick County, Indiana · 00.42 MI S of SR 61 · Structure no. 8700005
- Built
- 1969
- 56 years old
- Condition
- Fair
- inspected August 2023
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 32 ft
- 1 main span
- Daily traffic
- 145
- 2021 count
- Owner
- County
- County Highway Agency
About this bridge
Spurgeon Road over Smith Fork is a prestressed concrete box beam or girders - multiple carrying Spurgeon Road over Smith Fork in Warrick County, Indiana. It was built in 1969, so it is 56 years old, older than the Indiana average of 46.6 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 145 vehicles a day, roughly 10% of them trucks, projected to reach 238 by 2041. The structure is 32 ft (9.7 m) long and 26 ft wide. If it were closed, the detour would be 0.6 mi (1 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Spurgeon Road over Smith Fork built?
It was built in 1969, making it 56 years old in 2025.
What condition is Spurgeon Road over Smith Fork in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in August 2023.
How much traffic does Spurgeon Road over Smith Fork carry?
About 145 vehicles per day (2021 count), of which roughly 10% are trucks.
How long is Spurgeon Road over Smith Fork?
The structure is 32 ft (9.7 m) long with a longest span of 30 ft (9.1 m) and a deck 26 ft wide.
Who owns Spurgeon Road over Smith Fork?
It is owned by the County Highway Agency.