US Bridges

CR 600 West over I-64 Eb/Wb

Good

Warrick County, Indiana · 03.38 W SR 61 · Structure no. 033650

Built
1972
53 years old, rebuilt 2016
Condition
Good
inspected March 2024
Type
Stringer/Multi-beam or Girder
Steel Continuous
Length
229 ft
2 main spans
Daily traffic
320
2004 count
Owner
State
State Highway Agency

About this bridge

CR 600 West over I-64 Eb/Wb is a steel continuous stringer/multi-beam or girder carrying CR 600 West over I-64 Eb/Wb in Warrick County, Indiana. It was built in 1972 and reconstructed in 2016, so it is 53 years old, older than the Indiana average of 46.6 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 320 vehicles a day, roughly 10% of them trucks, projected to reach 531 by 2034. The structure is 229 ft (69.7 m) long and 35 ft wide. If it were closed, the detour would be 11.8 mi (19 km).

CarriesCR 600 West
CrossesI-64 Eb/Wb
Location03.38 W SR 61
RouteCounty Highway 0
StateIndiana
Coordinates38.18754, -87.35511
Functional classRural Minor Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionMarch 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation6: Equal to present minimum criteria
Deck geometry6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating39.2 US tons
Inventory rating30 US tons

Structure

MaterialSteel Continuous
DeckConcrete, cast-in-place
Main spans2
Design loadHS 20
Structure length229 ft (69.7 m)
Longest span113 ft (34.5 m)
Deck width35 ft (10.6 m)
Roadway width32 ft (9.7 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic320 (2004)
Projected traffic531 by 2034
Trucks10%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesHighway
Detour if closed11.8 mi (19 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was CR 600 West over I-64 Eb/Wb built?

It was built in 1972, making it 53 years old in 2025. It was reconstructed in 2016.

What condition is CR 600 West over I-64 Eb/Wb in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in March 2024.

How much traffic does CR 600 West over I-64 Eb/Wb carry?

About 320 vehicles per day (2004 count), of which roughly 10% are trucks.

How long is CR 600 West over I-64 Eb/Wb?

The structure is 229 ft (69.7 m) long with a longest span of 113 ft (34.5 m) and a deck 35 ft wide.

Who owns CR 600 West over I-64 Eb/Wb?

It is owned by the State Highway Agency.