US Bridges

Payne Place over Prairie Creek

Fair

Vigo County, Indiana · 00.50 S Oregan Ch · Structure no. 8400025

Built
1984
41 years old
Condition
Fair
inspected July 2023
Type
Slab
Wood or Timber
Length
26 ft
1 main span
Daily traffic
188
2017 count
Owner
County
County Highway Agency

About this bridge

Payne Place over Prairie Creek is a wood or timber slab carrying Payne Place over Prairie Creek in Vigo County, Indiana. It was built in 1984, so it is 41 years old, younger than the Indiana average of 46.6 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 188 vehicles a day, roughly 2% of them trucks, projected to reach 251 by 2037. The structure is 26 ft (7.9 m) long and 26 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesPayne Place
CrossesPrairie Creek
Location00.50 S Oregan Ch
RouteCounty Highway 0
StateIndiana
Coordinates39.32478, -87.42561
Functional classRural Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionJuly 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; action required to protect exposed foundations
Structural evaluation5: Somewhat better than minimum adequacy to tolerate being left in place as is
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating53.9 US tons
Inventory rating37.8 US tons

Structure

Structure typeSlab
MaterialWood or Timber
DeckWood or timber
Main spans1
Design loadUnknown
Structure length26 ft (7.9 m)
Longest span24 ft (7.3 m)
Deck width26 ft (7.8 m)
Roadway width24 ft (7.4 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic188 (2017)
Projected traffic251 by 2037
Trucks2%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Payne Place over Prairie Creek built?

It was built in 1984, making it 41 years old in 2025.

What condition is Payne Place over Prairie Creek in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in July 2023.

How much traffic does Payne Place over Prairie Creek carry?

About 188 vehicles per day (2017 count), of which roughly 2% are trucks.

How long is Payne Place over Prairie Creek?

The structure is 26 ft (7.9 m) long with a longest span of 24 ft (7.3 m) and a deck 26 ft wide.

Who owns Payne Place over Prairie Creek?

It is owned by the County Highway Agency.