SR 63 NB over Vermillion River
GoodVermillion County, Indiana · 00.62 N SR 234 · Structure no. 022730
- Built
- 1976
- 49 years old, rebuilt 1987
- Condition
- Good
- inspected August 2024
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 487 ft
- 7 main spans
- Daily traffic
- 3,290
- 2009 count
- Owner
- State
- State Highway Agency
About this bridge
SR 63 NB over Vermillion River is a steel continuous stringer/multi-beam or girder carrying SR 63 NB over Vermillion River in Vermillion County, Indiana. It was built in 1976 and reconstructed in 1987, so it is 49 years old, older than the Indiana average of 46.6 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 3,290 vehicles a day, roughly 34% of them trucks, projected to reach 4,557 by 2034. The structure is 487 ft (148.4 m) long and 42 ft wide. If it were closed, the detour would be 0.6 mi (1 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was SR 63 NB over Vermillion River built?
It was built in 1976, making it 49 years old in 2025. It was reconstructed in 1987.
What condition is SR 63 NB over Vermillion River in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in August 2024.
How much traffic does SR 63 NB over Vermillion River carry?
About 3,290 vehicles per day (2009 count), of which roughly 34% are trucks.
How long is SR 63 NB over Vermillion River?
The structure is 487 ft (148.4 m) long with a longest span of 74 ft (22.5 m) and a deck 42 ft wide.
Who owns SR 63 NB over Vermillion River?
It is owned by the State Highway Agency.