US Bridges

SR 65 over I-64 Eb/Wb

Good

Vanderburgh County, Indiana · 02.61 S SR 68 · Structure no. 023181

Built
2024
1 years old
Condition
Good
inspected December 2024
Type
Stringer/Multi-beam or Girder
Steel Continuous
Length
192 ft
2 main spans
Daily traffic
3,273
2023 count
Owner
State
State Highway Agency

About this bridge

SR 65 over I-64 Eb/Wb is a steel continuous stringer/multi-beam or girder carrying SR 65 over I-64 Eb/Wb in Vanderburgh County, Indiana. It was built in 2024, so it is 1 years old, younger than the Indiana average of 46.6 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 9 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 3,273 vehicles a day, roughly 11% of them trucks, projected to reach 3,492 by 2043. The structure is 192 ft (58.4 m) long and 39 ft wide. If it were closed, the detour would be 0.6 mi (1 km).

CarriesSR 65
CrossesI-64 Eb/Wb
Location02.61 S SR 68
RouteState Highway 65
StateIndiana
Coordinates38.16186, -87.68441
Functional classRural Major Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck9 ExcellentNo problems noted.
Superstructure9 ExcellentNo problems noted.
Substructure9 ExcellentNo problems noted.
Last inspectionDecember 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation9: Superior to present desirable criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Approach roadway alignment8: Equal to present desirable criteria
Operating rating48.9 US tons
Inventory rating37.8 US tons

Structure

MaterialSteel Continuous
DeckConcrete, cast-in-place
Main spans2
Design loadHL 93
Structure length192 ft (58.4 m)
Longest span95 ft (28.9 m)
Deck width39 ft (11.8 m)
Roadway width36 ft (10.9 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic3,273 (2023)
Projected traffic3,492 by 2043
Trucks11%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesHighway
Detour if closed0.6 mi (1 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was SR 65 over I-64 Eb/Wb built?

It was built in 2024, making it 1 years old in 2025.

What condition is SR 65 over I-64 Eb/Wb in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in December 2024.

How much traffic does SR 65 over I-64 Eb/Wb carry?

About 3,273 vehicles per day (2023 count), of which roughly 11% are trucks.

How long is SR 65 over I-64 Eb/Wb?

The structure is 192 ft (58.4 m) long with a longest span of 95 ft (28.9 m) and a deck 39 ft wide.

Who owns SR 65 over I-64 Eb/Wb?

It is owned by the State Highway Agency.