US Bridges

SR 19 over Cicero Creek

Fair

Tipton County, Indiana · 00.06 S of SR 28 · Structure no. 8000075

Built
1975
50 years old
Condition
Fair
inspected September 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete Continuous
Length
155 ft
3 main spans
Daily traffic
1,000
2018 count
Owner
State
State Highway Agency

About this bridge

SR 19 over Cicero Creek is a prestressed concrete continuous stringer/multi-beam or girder carrying SR 19 over Cicero Creek in Tipton County, Indiana. It was built in 1975, so it is 50 years old, older than the Indiana average of 46.6 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 1,000 vehicles a day, roughly 6% of them trucks, projected to reach 1,400 by 2038. The structure is 155 ft (47.3 m) long and 34 ft wide. If it were closed, the detour would be 0.6 mi (1 km).

CarriesSR 19
CrossesCicero Creek
Location00.06 S of SR 28
RouteState Highway 19
StateIndiana
Coordinates40.28172, -86.03167
Functional classUrban Collector

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection7 GoodSome minor problems.
Last inspectionSeptember 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation7: Better than present minimum criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment6: Equal to present minimum criteria
Operating rating56.4 US tons
Inventory rating40.7 US tons

Structure

MaterialPrestressed Concrete Continuous
DeckConcrete, cast-in-place
Main spans3
Design loadHS 20
Structure length155 ft (47.3 m)
Longest span51 ft (15.5 m)
Deck width34 ft (10.5 m)
Roadway width32 ft (9.7 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic1,000 (2018)
Projected traffic1,400 by 2038
Trucks6%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed0.6 mi (1 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was SR 19 over Cicero Creek built?

It was built in 1975, making it 50 years old in 2025.

What condition is SR 19 over Cicero Creek in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in September 2024.

How much traffic does SR 19 over Cicero Creek carry?

About 1,000 vehicles per day (2018 count), of which roughly 6% are trucks.

How long is SR 19 over Cicero Creek?

The structure is 155 ft (47.3 m) long with a longest span of 51 ft (15.5 m) and a deck 34 ft wide.

Who owns SR 19 over Cicero Creek?

It is owned by the State Highway Agency.