US Bridges

CR 700E over Polywog Creek

Fair

Tipton County, Indiana · 00.30 S of Division RD · Structure no. 8000061

Built
1950
75 years old
Condition
Fair
inspected November 2024
Type
Culvert
Steel
Length
42 ft
2 main spans
Daily traffic
100
2024 count
Owner
County
County Highway Agency

About this bridge

CR 700E over Polywog Creek is a steel culvert carrying CR 700E over Polywog Creek in Tipton County, Indiana. It was built in 1950, so it is 75 years old, older than the Indiana average of 46.6 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 100 vehicles a day, roughly 3% of them trucks, projected to reach 150 by 2044. The structure is 42 ft (12.8 m) long and 48 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesCR 700E
CrossesPolywog Creek
Location00.30 S of Division RD
RouteCounty Highway 69
StateIndiana
Coordinates40.30094, -85.87966
Functional classRural Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Channel and channel protection5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Culvert6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionNovember 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation6: Equal to present minimum criteria
Deck geometry3: Basically intolerable, requiring high priority of corrective action
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating46.7 US tons
Inventory rating39.2 US tons

Structure

Structure typeCulvert
MaterialSteel
DeckNot applicable
Main spans2
Design loadHS 20
Structure length42 ft (12.8 m)
Longest span20 ft (6 m)
Deck width48 ft (14.6 m)
Roadway width18 ft (5.4 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic100 (2024)
Projected traffic150 by 2044
Trucks3%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was CR 700E over Polywog Creek built?

It was built in 1950, making it 75 years old in 2025.

What condition is CR 700E over Polywog Creek in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in November 2024.

How much traffic does CR 700E over Polywog Creek carry?

About 100 vehicles per day (2024 count), of which roughly 3% are trucks.

How long is CR 700E over Polywog Creek?

The structure is 42 ft (12.8 m) long with a longest span of 20 ft (6 m) and a deck 48 ft wide.

Who owns CR 700E over Polywog Creek?

It is owned by the County Highway Agency.