US Bridges

SR 25 NB over CR 900 N

Fair

Tippecanoe County, Indiana · 10.80 N I-65 · Structure no. 080474

Built
2013
12 years old
Condition
Fair
inspected February 2024
Type
Tee Beam
Prestressed Concrete
Length
93 ft
1 main span
Daily traffic
12,479
2021 count
Owner
State
State Highway Agency

About this bridge

SR 25 NB over CR 900 N is a prestressed concrete tee beam carrying SR 25 NB over CR 900 N in Tippecanoe County, Indiana. It was built in 2013, so it is 12 years old, younger than the Indiana average of 46.6 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 12,479 vehicles a day, roughly 22% of them trucks, projected to reach 13,334 by 2031. The structure is 93 ft (28.4 m) long and 57 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesSR 25 NB
CrossesCR 900 N
Location10.80 N I-65
RouteState Highway 25
StateIndiana
Coordinates40.5478, -86.70306
Functional classRural Principal Arterial - Other

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionFebruary 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation6: Equal to present minimum criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating87.5 US tons
Inventory rating60.4 US tons

Structure

Structure typeTee Beam
MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHS 20
Structure length93 ft (28.4 m)
Longest span93 ft (28.4 m)
Deck width57 ft (17.4 m)
Roadway width54 ft (16.5 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic12,479 (2021)
Projected traffic13,334 by 2031
Trucks22%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was SR 25 NB over CR 900 N built?

It was built in 2013, making it 12 years old in 2025.

What condition is SR 25 NB over CR 900 N in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in February 2024.

How much traffic does SR 25 NB over CR 900 N carry?

About 12,479 vehicles per day (2021 count), of which roughly 22% are trucks.

How long is SR 25 NB over CR 900 N?

The structure is 93 ft (28.4 m) long with a longest span of 93 ft (28.4 m) and a deck 57 ft wide.

Who owns SR 25 NB over CR 900 N?

It is owned by the State Highway Agency.