US Bridges

CR 900E over SR 25 Sb/Nb N&s RR

Good

Tippecanoe County, Indiana · 06.90 N I-65 · Structure no. 076950

Built
2010
15 years old
Condition
Good
inspected March 2024
Type
Tee Beam
Prestressed Concrete Continuous
Length
366 ft
3 main spans
Daily traffic
1,840
2018 count
Owner
State
State Highway Agency

About this bridge

CR 900E over SR 25 Sb/Nb N&s RR is a prestressed concrete continuous tee beam carrying CR 900E over SR 25 Sb/Nb N&s RR in Tippecanoe County, Indiana. It was built in 2010, so it is 15 years old, younger than the Indiana average of 46.6 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 1,840 vehicles a day, roughly 17% of them trucks, projected to reach 2,020 by 2028. The structure is 366 ft (111.6 m) long and 38 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesCR 900E
CrossesSR 25 Sb/Nb N&s RR
Location06.90 N I-65
RouteCounty Highway 900
StateIndiana
Coordinates40.49961, -86.73299
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionMarch 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating67.1 US tons
Inventory rating51.8 US tons

Structure

Structure typeTee Beam
MaterialPrestressed Concrete Continuous
DeckConcrete, cast-in-place
Main spans3
Design loadHS 25 or greater
Structure length366 ft (111.6 m)
Longest span122 ft (37.2 m)
Deck width38 ft (11.6 m)
Roadway width35 ft (10.7 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic1,840 (2018)
Projected traffic2,020 by 2028
Trucks17%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesHighway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was CR 900E over SR 25 Sb/Nb N&s RR built?

It was built in 2010, making it 15 years old in 2025.

What condition is CR 900E over SR 25 Sb/Nb N&s RR in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in March 2024.

How much traffic does CR 900E over SR 25 Sb/Nb N&s RR carry?

About 1,840 vehicles per day (2018 count), of which roughly 17% are trucks.

How long is CR 900E over SR 25 Sb/Nb N&s RR?

The structure is 366 ft (111.6 m) long with a longest span of 122 ft (37.2 m) and a deck 38 ft wide.

Who owns CR 900E over SR 25 Sb/Nb N&s RR?

It is owned by the State Highway Agency.