US Bridges

Orchard Road over Branch Lake Drain

Good

Spencer County, Indiana · 00.27 N of CR 600 N · Structure no. 7400091

Built
2006
19 years old
Condition
Good
inspected September 2024
Type
Stringer/Multi-beam or Girder
Steel
Length
32 ft
1 main span
Daily traffic
370
2022 count
Owner
County
County Highway Agency

About this bridge

Orchard Road over Branch Lake Drain is a steel stringer/multi-beam or girder carrying Orchard Road over Branch Lake Drain in Spencer County, Indiana. It was built in 2006, so it is 19 years old, younger than the Indiana average of 46.6 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 370 vehicles a day, roughly 6% of them trucks, projected to reach 570 by 2042. The structure is 32 ft (9.7 m) long and 24 ft wide. If it were closed, the detour would be 2.5 mi (4 km).

CarriesOrchard Road
CrossesBranch Lake Drain
Location00.27 N of CR 600 N
RouteCounty Highway 29
StateIndiana
Coordinates37.97771, -87.1099
Functional classRural Minor Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection7 GoodSome minor problems.
Last inspectionSeptember 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation7: Better than present minimum criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy6: Equal to present minimum criteria
Approach roadway alignment6: Equal to present minimum criteria
Operating rating61.1 US tons
Inventory rating47.2 US tons

Structure

MaterialSteel
DeckConcrete, cast-in-place
Main spans1
Design loadHS 20
Structure length32 ft (9.7 m)
Longest span29 ft (8.8 m)
Deck width24 ft (7.3 m)
Roadway width24 ft (7.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic370 (2022)
Projected traffic570 by 2042
Trucks6%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed2.5 mi (4 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Orchard Road over Branch Lake Drain built?

It was built in 2006, making it 19 years old in 2025.

What condition is Orchard Road over Branch Lake Drain in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in September 2024.

How much traffic does Orchard Road over Branch Lake Drain carry?

About 370 vehicles per day (2022 count), of which roughly 6% are trucks.

How long is Orchard Road over Branch Lake Drain?

The structure is 32 ft (9.7 m) long with a longest span of 29 ft (8.8 m) and a deck 24 ft wide.

Who owns Orchard Road over Branch Lake Drain?

It is owned by the County Highway Agency.