Slab RD over Flat Creek
FairScott County, Indiana · 00.53 S Marshfield RD · Structure no. 7200027
- Built
- 1982
- 43 years old
- Condition
- Fair
- inspected September 2023
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 45 ft
- 1 main span
- Daily traffic
- 650
- 2021 count
- Owner
- County
- County Highway Agency
About this bridge
Slab RD over Flat Creek is a prestressed concrete box beam or girders - multiple carrying Slab RD over Flat Creek in Scott County, Indiana. It was built in 1982, so it is 43 years old, younger than the Indiana average of 46.6 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 650 vehicles a day, roughly 5% of them trucks, projected to reach 1,150 by 2041. The structure is 45 ft (13.7 m) long and 24 ft wide. If it were closed, the detour would be 2.5 mi (4 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Slab RD over Flat Creek built?
It was built in 1982, making it 43 years old in 2025.
What condition is Slab RD over Flat Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in September 2023.
How much traffic does Slab RD over Flat Creek carry?
About 650 vehicles per day (2021 count), of which roughly 5% are trucks.
How long is Slab RD over Flat Creek?
The structure is 45 ft (13.7 m) long with a longest span of 40 ft (12.1 m) and a deck 24 ft wide.
Who owns Slab RD over Flat Creek?
It is owned by the County Highway Agency.