Sample ST over Conrail and Gtw RR
FairSt. Joseph County, Indiana · 00.10 W of Olive ST · Structure no. 7100109
- Built
- 1984
- 41 years old, rebuilt 2017
- Condition
- Fair
- inspected September 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete Continuous
- Length
- 405 ft
- 5 main spans
- Daily traffic
- 14,005
- 2020 count
- Owner
- County
- County Highway Agency
About this bridge
Sample ST over Conrail and Gtw RR is a prestressed concrete continuous stringer/multi-beam or girder carrying Sample ST over Conrail and Gtw RR in St. Joseph County, Indiana. It was built in 1984 and reconstructed in 2017, so it is 41 years old, younger than the Indiana average of 46.6 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 14,005 vehicles a day, roughly 3% of them trucks, projected to reach 14,200 by 2040. The structure is 405 ft (123.3 m) long and 78 ft wide. If it were closed, the detour would be 0.6 mi (1 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Sample ST over Conrail and Gtw RR built?
It was built in 1984, making it 41 years old in 2025. It was reconstructed in 2017.
What condition is Sample ST over Conrail and Gtw RR in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in September 2024.
How much traffic does Sample ST over Conrail and Gtw RR carry?
About 14,005 vehicles per day (2020 count), of which roughly 3% are trucks.
How long is Sample ST over Conrail and Gtw RR?
The structure is 405 ft (123.3 m) long with a longest span of 93 ft (28.3 m) and a deck 78 ft wide.
Who owns Sample ST over Conrail and Gtw RR?
It is owned by the County Highway Agency.