Washington ST over Baugo Creek & Walk Path
GoodSt. Joseph County, Indiana · 00.10 W of Ash RD · Structure no. 7100027
- Built
- 1972
- 53 years old, rebuilt 2010
- Condition
- Good
- inspected September 2024
- Type
- Box Beam or Girders - Single or Spread
- Prestressed Concrete Continuous
- Length
- 125 ft
- 3 main spans
- Daily traffic
- 3,790
- 2022 count
- Owner
- County
- County Highway Agency
About this bridge
Washington ST over Baugo Creek & Walk Path is a prestressed concrete continuous box beam or girders - single or spread carrying Washington ST over Baugo Creek & Walk Path in St. Joseph County, Indiana. It was built in 1972 and reconstructed in 2010, so it is 53 years old, older than the Indiana average of 46.6 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 3,790 vehicles a day, roughly 8% of them trucks, projected to reach 5,632 by 2042. The structure is 125 ft (38 m) long and 34 ft wide. If it were closed, the detour would be 0.6 mi (1 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Washington ST over Baugo Creek & Walk Path built?
It was built in 1972, making it 53 years old in 2025. It was reconstructed in 2010.
What condition is Washington ST over Baugo Creek & Walk Path in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in September 2024.
How much traffic does Washington ST over Baugo Creek & Walk Path carry?
About 3,790 vehicles per day (2022 count), of which roughly 8% are trucks.
How long is Washington ST over Baugo Creek & Walk Path?
The structure is 125 ft (38 m) long with a longest span of 41 ft (12.4 m) and a deck 34 ft wide.
Who owns Washington ST over Baugo Creek & Walk Path?
It is owned by the County Highway Agency.