I-90 EB over Riverside DR Nb/Sb Trail
FairSt. Joseph County, Indiana · 01.04 W SR 933 · Structure no. 047670
- Built
- 1956
- 69 years old, rebuilt 2018
- Condition
- Fair
- inspected August 2023
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 215 ft
- 5 main spans
- Daily traffic
- 13,968
- 2004 count
- Owner
- Toll Authority
- State Toll Authority
About this bridge
I-90 EB over Riverside DR Nb/Sb Trail is a steel stringer/multi-beam or girder carrying I-90 EB over Riverside DR Nb/Sb Trail in St. Joseph County, Indiana. It was built in 1956 and reconstructed in 2018, so it is 69 years old, older than the Indiana average of 46.6 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 13,968 vehicles a day, roughly 5% of them trucks, projected to reach 32,257 by 2031. The structure is 215 ft (65.5 m) long and 35 ft wide. If it were closed, the detour would be 0.6 mi (1 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was I-90 EB over Riverside DR Nb/Sb Trail built?
It was built in 1956, making it 69 years old in 2025. It was reconstructed in 2018.
What condition is I-90 EB over Riverside DR Nb/Sb Trail in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in August 2023.
How much traffic does I-90 EB over Riverside DR Nb/Sb Trail carry?
About 13,968 vehicles per day (2004 count), of which roughly 5% are trucks.
How long is I-90 EB over Riverside DR Nb/Sb Trail?
The structure is 215 ft (65.5 m) long with a longest span of 41 ft (12.4 m) and a deck 35 ft wide.
Who owns I-90 EB over Riverside DR Nb/Sb Trail?
It is owned by the State Toll Authority.